Sunday, September 16, 2012

The Shewhart Cycle -Part 2-



The Shewhart Cycle -Part 2-
 PDCA – Plan, Do, Check, Act
Also Presented  as  “The Deming Wheel” or “The Shewhart Cycle”







Continuous improvement
The PDCA is an example of continuous improvement, however there are other implementations of this idea. For example Kaizen is another approach adopted by Japanese manufacturers.
One of the significant aspects of continuous improvement systems is aiming higher next time so that at the review stage higher targets are set so that the business continues to improve.

This is an essential part of the standard ISO 14000 and it is what differentiates environmental management systems from quality systems.

Sources of information for continuous improvement
To realise continual improvements, a business should not only know what deficiencies exist, but understand why they exist.
This can be achieved is by analysing the root cause(s) of environmental management system deficiencies.
Some useful sources of information for continuous improvement could include:
·         experience gained from corrective and preventive actions
·         external benchmarking against best practices
·         intended or proposed changes applicable to legal requirements and other requirements to which the business subscribes
·         results of environmental management system and compliance audits
·         results of monitoring of key characteristics of operations
·         results of progress towards achieving objectives and targets, and
·         views of interested parties, including employees, customers and suppliers.


Examples of continuous improvement
Improvements can be made either within or outside the process of setting and reviewing environmental objectives and targets. Some examples of improvement include:
·         establishing a process for evaluating new materials to promote the use of less harmful materials
·         improving a business's process for identifying applicable legal requirements so that new compliance requirements are identified in a more timely fashion
·         introducing wastewater treatment processes to allow water reuse
·         redesigning delivery routes to reduce fossil fuel consumption by transportation companies
·         setting objectives and targets to implement fuel substitution in operations and reduce particulate emissions.
The PDCA cycle also helps to understand when one might wish to employee different quality tools.  The visual below is used with permission of Jerry Svendor of Westshore Community College, Michigan.

.



THE TACTICAL OBJECTIVES IN A SUPPLY CHAIN
The global objective of a Supply Chain is customers’ satisfaction.  At the same time, individual components of the Supply Chain aim at maximizing their shareholder value by maximizing the Return on Investment (ROI) of their investors. ROI is the ratio of profit to capital employed over one year. This strategic objective can be translated into several short- and medium-term objectives at the tactical level.

  The main tactical level objectives in a Supply Chain are:
•         Minimizing the time required for converting orders into cash.
•         Minimizing the total Work-In-Process (WIP) in the Supply Chain.
•         Improving pipeline visibility, that is the visibility of each one of the activities of the Supply Chain by each one of the partners.
•         Improving visibility of demand by each one of the partners.
•         Improving quality.
•         Reducing costs.
•         Improving services.

PERFORMANCE EVALUATION OF A SUPPLY CHAIN
Financial evaluation
Costs to take into account in the evaluation are the costs per unit (of product, or service). This cost per unit should be compared with the price paid by customers to enjoy the product or the service. 

Operational evaluation
Three main parameters should be measured to evaluate this aspect. These parameters are:
-          The availability.
-          The adequacy to customers’ expectations.
-          Customers’ service


Customers’ service

Adequacy to customers’ expectations
•         The question to be answered here is the following: are the products or services being provided closer to customers’ requirements than those of the competitors? The comparison of the "closeness" of products or services to customer expectation is more difficult to measure.

 The following measures should be made:
•         How many phone calls are necessary, on the average, to reach an employee? The result should be as close as possible to one.
•         How many employees should the customer get in touch with, in order to obtain the information he/she is looking for? The result should also be as close as possible to one.
•         How long does it take to obtain an appointment?
•         How long does it take to replace the product in case of breakdown, or to replace the provider of the service if necessary?
•         What is the average delivery delay? This aspect is important to gain new customers and keep them. As a consequence, this delay should be equal to zero.
•         What is the percentage of first time satisfied orders, i.e., orders that are correct in quantity and quality?
•         What is the percentage of invoices that are not accurate?
•         What is the time required, on average, to complete an incomplete delivery?
•         What is the time required, on average, to correct an invoice that is not accurate?
•         Do the Supply Chain offer training if necessary?



Check Our Team Public Service Blog...
...................................................................Only Out of the Box Ideas



WAMDA Team
                                                                                                       Walaa Maher ....Sep 12

Friday, September 14, 2012

Intermodal Freight Terminals

 1. DEFINITION OF THE SUBJECT

Intermodal Freight Terminals (IFT) or transfer points are places equipped for the transhipment and storage of Intermodal Transport Units (ITU). 
They connect at least two transport modes, which usually are road and rail, although waterborne (sea and inland waterways) and air transport can also be integrated. It is possible to find terminal companies and bodies handling both freight transport (eg. freight forwarders, shippers, transport operators, customs) and accompanying services (eg. storage, maintenance and repair): in this case IFT are also referred to as logistic centres or freight villages.

Terminals represent the nodal points of the intermodal transport network and their efficiency significantly affects the entire intermodal freight transport chain. Efficient intermodal transport requires infrastructure planners and managers across Europe to co-operate in establishing coherent networks of efficient transfer points, which are the weakest links in the current intermodal transport system and a major generator of friction costs.

These costs are generated through many factors. First of all, there is a lack of a coherent network of modes and interconnections between the modes in a number of high density corridors in Europe. There is also inadequate access by rail, road or waterborne transport to existing transfer points, which can hamper the integration of these modes and transfer between modes.

Another factor is the lack or inadequacy of Interoperability between modes and loading units. In fact, dealing with a variety of loading unit dimensions and different standards for transport means and infrastructure (often regulated differently by country and by mode) lowers the levels of interoperability between different modes, and produces congestion and inefficiencies at terminals. 

Finally, present-day terminals, which are usually marked by a combination of heavy engineering and manual processes, are not managed efficiently with appropriate ICT technologies.

The absence of a systematic network for data interchange along the entire intermodal transport chain is a source of high costs and service deficiencies. Existing modal-based information transmission systems require users to re-enter similar data at each interface, possibly according to different messages or EDI standards. The implementation of generalised systems for electronic communication between the different partners in the intermodal chain would mean that there was the opportunity to change operations at short notice along the journey. The absence of systems enabling tracking and tracing during the whole journey across modes, does not allow for a quick detection of errors and false routings.

2. RESEARCH NEEDS

Research projects carried out before the Fifth Framework Programme (FP5) have addressed many issues relating to the improvement of the efficiency of intermodal terminals.
Some have focused on general aspects of the intermodal network and on tools or solutions for the effective integration of modes in the door-to-door transport chain. Others have looked at some on the improvement of technical operations and the information flows. 

The results have made it clear that it is necessary not only to further investigate and find solutions for issues already addressed, but also to direct research efforts towards new challenging issues. First of all, it is essential to guarantee permanent concerted activities in the field of intermodal terminals in order to create and maximise synergy among intermodal transport RTD projects carried out at European and national level.

There is also a need for improving intermodal transport operations and the quality of the services offered, concentrating on the use of information technologies for terminal management purposes, focusing on the quality of inland terminals and investigating the opportunities for the integration of intermodal terminals in seaports and inland ports as well as the enhancement of port operations. It is also necessary to develop and assess harmonised security and safety procedures for freight intermodal transport operations, since theft and damage to ITUs either inside terminals or
during transport, reduces the attractiveness of intermodal transport.

Research efforts are needed to continue to improve harmonisation and interoperability between transport modes, transport equipment and loading units. Technical specifications for transport means are often regulated differently by country and by mode. The incompatibility of the transport equipment for road, rail, short sea and inland waterway traffic raises transfer and handling costs and necessitates cumbersome transhipment techniques. Furthermore new solutions are needed for the optimisation and rationalisation of transfer procedures and techniques. There is a particular need to integrate horizontal transhipment technologies in the intermodal door to door chain, because their technical features make them more suitable and economically convenient than the vertical ones for low traffic fl ows and small terminal operations.

With the enlargement of the EU and the corresponding development of the Trans- European Transport Networks (TENT) towards Central and Eastern European Countries (CEECs), it has also emerged that there is the need for research on the interoperability of the transport networks at the terminal at border crossings within the EU and towards CEECs in order to overcome technical and operational barriers. It is also necessary to assess the availability of intermodal transport means and suitable infrastructures. 

Finally, it is vital to continue the development of integrated information systems and ICT technologies in order to make better use of existing capacity and infrastructures, through a more efficient organisation and management of the terminal operations.



Yara Hatem

Thursday, September 13, 2012

3PL Define the Meaning of Cost Saving & Better Service



 To the non-experienced eye 3PL is just an expression that recently has dominated the organizations, but what lots of people don’t know about the Third party provider is that it’s an essential strategy to follow for various organizations.

Simply, The use of third party logistics, or 3PL, means a substantial cost savings to companies who would ordinarily have to lease or otherwise contract these services.

A third-party logistics(3PL) provider or “third party’’ logistics services to companies for part, or sometimes all of their supply chain management function.
3PL typically specialized in integrated operation, warehousing and transportation services that can be scaled and customized to customer needs.
Many companies are deviating from having their own warehouses and transportation services to that of contracting with various services providers such as UPS (United Parcel Service).
For many companies, contracting with services providers is easier and cheaper than doing the work themselves. After all, they don't have to worry about storage, transportation, or distribution of the material. With a phone call to the 3PL company, they arrange for the material to be shipped to their customer or they pre-arrange a schedule for a specified amount of product to be released to the customer on certain days of the week or month. They don't even have to call a trucking company, since most of 3PL have their own fleet of trucks for transportation of goods.
The $100 billion 3PL market has experienced dramatic growth of approximately 15% per year over the last decade and shows no signs of slowing down. statistics shows that 42% of shippers are currently planning to switch to 3PL; 17% because of cost, 25% because of services (saving time and money) Many experts within the industry have observed that only 10% of logistics services are currently outsourced in the U.S. and believe that the U.S. will transition to a model more similar to that of European countries, where approximately 40% of logistics services are outsourced to 3PL service providers. 3PL service providers will propel growth into the future.
More companies are choosing to contract services with 3PL Company, so they don't have to concern themselves with the warehouse, distribution, and transportation activities. Delegating these functions to someone else gives the company more opportunity to concentrate on their core activities. It's a function that companies is a firm that provide outsourced tend to find time consuming and often boring from a paperwork standpoint, so if they can leave all that up to a third party, that improves their efficiency. Depending on the terms of the contract, sometimes the 3PL company also handles billing and collecting payments from company’s customers for the products it ships. This frees time that your accounting department can use to take care of other financial matters.
Freeing the company of continually hiring warehouse workers, replacing fleets of trucks, and paying bills for shipments to customers will allow them to operate more economically, as they will be able to operate with less staff.

..................... Sep-12

Sunday, August 12, 2012

Do you really know what Shewhart Cycle is ? -Part 1-


The Shewhart Cycle -Part 1-
 PDCA – Plan, Do, Check, Act
Also Presented  as  “The Deming Wheel” or “The Shewhart Cycle” or “PDSA: Plan Do Study Act”





Background
PDCA’s were first described by Walter A Shewhart as Plan, Do and See in 1939 in his book, Statistical Method from the Viewpoint of Quality Control2 which is rooted in the scientific method (Francis Bacon 1620). The scientific method can be written as "hypothesis"–"experiment"–"evaluation" or plan, do and check.  Shewhart’s protégé W. Edwards Deming modified the cycle to Plan, Do, Study, Act and put the concept to work.  Deming was an American Statistician who couldn’t get buy-in from his American counterparts in the post-war era.  Japan, however, welcomed him and he is associated with the invention of Total Quality Management (TQM) and the rise of Japan as a manufacturing nation.  In Japan, Deming taught about the use of statistics and the PDSA cycle. Within 50 years, attributable in part to Deming and his wealth of knowledge, Japan went from manufacturing cheap products to manufacturing some of the highest quality products in the world.  In 1960 Deming was given a medal by the Japanese Emperor for his service to the country’s industry.


PDSA Cycles are related to Kaizen thinking.  The term Kaizen is derived from two Japanese characters; kai, meaning “change” and zen meaning “continuous improvement.” Eliminating waste in the value stream is the goal of Kaizen. Alternatively, Six Sigma programs utilize the notion of PDSA cycles in their DMAIC strategy-"define, measure, analyze, improve, control".



Plan-do-check-act (PDCA cycle)
One method for implementing and sustaining continuous improvement involves a useful tool called the 'plan-do-check-act' cycle or PDCA.
The PDCA cycle may be used to implement improvements and to ensure that improvements are sustained in all critical areas of the business such as safety and environment, quality, morale, delivery and cost.
The environmental management system detailed in the ISO 14004:2004 International Standard follows a PDCA management model.

PDCA is an ongoing, iterative process that enables a business to establish, implement and maintain and continually improve its environmental policy.
The PDCA cycle is a checklist of four stages you must go through, from identifying the area for improvement through to the improved work area. It emphasises and demonstrates that improvement programs must do the following:
1.      Start with careful planning.
2.      Result in effective action.
3.      Check the results.
4.      Move on again to careful planning in a continuous cycle.
The four stages are illustrated in Figure 1.

Figure 1: The PDCA cycle
The plan stage is performed throughout the planning and implementation of improvement solutions.
During the check stage the team collects data and checks whether the solutions are producing the expected improvements.
During the act stage the team monitors the process to identify further improvement opportunities and takes action to introduce them.
However, the improvement process does not stop here. As continuous improvement is never-ending, the PDCA cycle continues. PDCA is what drives continuous improvement.
Here is a guideline to the plan-do-check-act cycles.
Plan
*      Establish an ongoing planning process.
*      Describe the results you want to achieve.
*      Identify and monitor applicable legal requirements, policy objectives  and other commitments.
*      Set internal performance criteria where appropriate (operating standards, timeframes, quality control, cost considerations).
*      Clarify the standards (time, quality, cost etc).
*      List all activities required to achieve the results.
*      Prioritise the activities.
*      Determine the timing and duration of each.
*      Prepare a diagram to illustrate the activity sequence.
*      Allocate people and resources.
*      Set objectives and targets on what should be measured, where and when it should be measured and what methods should be used.
*      Develop and use performance indicators.
Do
·         After the planning stage, the plan needs to be implemented.
·         Assign roles and responsibilities.
·         Maintain operational control and emergency response.
·         Provide all adequate resources including the implementation of document control.
·         Provide training to relevant staff.
·         Establish processes for internal communication.
Check
·         You need to evaluate and measure the results.
·         Complete a systematic approach to monitoring and measurement activities that ensure compliance by identifying the key characteristics through a process approach.
·         Progress is compared against key performance indicators and set targets from the planning stage.
·         Identify nonconformity and take corrective and preventive actions.
·         Manage records.
Act
·         Review and take action to improve the company's operations. Identify areas for improvement and make recommendations.
·         Here you need to improve the process further. For example, if results achieved are as planned against the targets set, the current method is captured in a new or revised standard operating procedure (SOP) to ensure future success.
·         When results are not as planned, the PDCA cycle is repeated on the same business activity with recommendations on what went wrong detailed for part of the next planning cycle.
·         An essential element of continuous improvement is aiming higher next time so that the review stage sets higher targets than previously recognised.
·         When results are successful the PDCA cycle is completed on another area of the company for continual improvement.
MORE Questions on The Art of Act on Materials Supply Chain



3alashan Masr.. A New Out of the box idea..



Check this Blog and share .... Our Team Public Service...



Issue 1


 لو عايزين ننهض ببلدنا نفكر بره الصندوق شوية

المياه :
اعطاء كل القرى السياحية التي تطل على البحر مباشرة فرصة لمدة 6 اشهر لبناء وحدات تحلية ميه كاملة تحقق الاكتفاء الذاتي الكامل مع هامش للتعبئة و البيع للمدن المجاورة و الفنادق التي لاتطل على بحر
القيمة من المشروع :
1-      القرى هاتكسب الميه و الاكتفاء الذاتي + هامش الربح من البيع
2-      التنافسية هتقلل سعر البيع في كافة الجمهورية
3-      هنققلل استهلاك المياه الجوفية و نستغلها  للزراعة
4-      هتقلل ملايين الجنيهات من الانفاق على  النقل و التخزين- تخيل مصنع سيوة في الواحات و بينقل الغردقة –
5-      طبعا الزحمة هتقل
6-      فرص عمل كبيرة في كل محطه و قرية
7-      جودة مياه عالية  - لان القرية محتاجة تحافظ على النجوم السياحية –
8-      معروف ان تكنولوجيا تحلية الميه غالية  بس ده لان العرض و الطلب قليل – انما بزيادة الطلب التكنولوجيا هترخص
------------------------------------------------------------------------------------------------------------------------

الكهرباء :
 ممكن نعمل تصميم لسلالم مترو الانفاق الي سلم "على سوست او حاجة شبه كده " مع كل حركة عليه ينتج طاقة كهربائيه ولو جزء من ملي من امبير ... ويبقى ده مشروع خريجين كلية هندسة القاهرة و عين شمس لعام 12-13
و كل مجموعة طلبة عليها سلم واحد بس ...و التقييم بتاع المشروع يبقى على كم الطاقة المنتجة ؟ 
القيمة من المشروع :
1.        وفرنا استهلاك اضاءة مترو الانفاق
2.        ا انتجنا كهرباء لانارة الشارع الي فيه المحطة
3.        دربنا الطلبة عملي بدل المشاريع الفي مكتبة الجامعة
4.        حسسنا 1000 طالب انهم فعلا و هما لسه طلبة انهم ساهموا في حاجة في البلد و اسمهم عليها
 ----------------------------------------------------------------------------------------------------------------------
السولار :  (برضه هانضغط على شباب هندسة )
ممكن مشروع خريجين كلية هندسة لعام 12-  13في الاقاليم ان كل مجموعة تاخد اتوبيس واحد بس تحوله لاتوبيس يعمل بالطاقة البديلة...  و ميزانية المشروع من لغي دعم البنزين ال 95  ... تخيل انخفاض استهلاك السولار الي 40% ( الاستهلاك الليلي في حالة عدم الشحن )
و كل مجموعة طلبة عليها اتوبيس واحد بس ...و التقييم بتاع المشروع يبقى على كم الطاقة المنتجة + كم التوفيير في السولار  ؟ 
القيمة من المشروع :
1.        وفرنا 60% من السولار  المستهلك في النقل العام
2.        60% من فلوس دعم السولار < الحكومة قالت ان ده لوحده يتعدى ال40 مليار جنيه >
3.        انتجنا كهرباء من مصدر "محب للبيئة "
4.        حسسنا 1000 طالب من الاقاليم ان ليهم لازمة بدل احساس ان القاهرة هي الحل و  انهم فعلا و هما لسه طلبة انهم ساهموا في حاجة في البلد و اسمهم عليها
 ------------------------------------------------------------------------------------------------------------------------

كهرباء و موصلات و سولار و استهلاك موارد :
بما ان الموظف الحكومي لا يعمل الا 27 دقيقة في اليوم ( حسب احصائيات الحكومة ) القديمة و الجديدة 
نجعل اسبوع العمل في الحكومة فقط 4 ايام في الاسبوع بنفس المرتب 
+ يوم من ال4 يكون بس للتدريب المهني 
على ان تكون الاجازة اليوم التالت متغير 
و الجزء المشترك هو يوم الجمعة 
و الحكومة تشتغل بنظام الورادي المستمرة
القيمة من المشروع :
1-        يوم من دعم الموصلات العامة 
2-        يوم من استهلاك الكهرباء في الحكومة 
3-        التكدس في الموصلات 50% يوميا
4-         التاخير المستمر داخل الهيئات الحكومية للاوراق الرسمية ( تخيل سرعة الاداء المتوقعة لان كل موظف عارف ان الي هيستلم منه الوردية هيشبشبلوا لو اتاخر في تخليص ورقة 
5-        راحة المواطن في الوصول لوظيفته  و قضاء وقت اكبر من الراحة
6-        تدريب الافراد اسبوعيا لمدة 6 ساعات هيحسسه ان ليه قيمة و يبدأ في التفكير ان ينمو بالمكان او يتركه و يلتحق بالقطاع الخاص او يفتح مشروع فتكون الحكومة مصنع للكوادر العاملة مش جراج للكسالى
7-        تقليل استهلاك مهول للاتوبيسات  ( الاتوبيس اساسا مصمم ل 60 شخص ) بيتحمل 150 فبيبوظ اسرع و هكذا

المهم الافكار كتير و الله بس المهم التنفيذ و يكون المسئولين نفسهم مستعدين يقعودا معانا "بره الصندوق "

Walaa Maher  
  

Basics Matter… “Why we lost the contract?”

After 20 years of working in Supply Chain, still my passion is in the area of Material and Supply Management… so to answer a question th...